
[Jun 19, 2026] Fully Updated C-P2W43-2023 Dumps - 100% Same Q&A In Your Real Exam
Latest C-P2W43-2023 Exam Dumps - Valid and Updated Dumps
NEW QUESTION # 49
What do you need to configure to enable entries in the action log of a piece of equipment?
- A. Define the corresponding history related field for the equipment reference category.
- B. Define history related fields in the usage period customizing.
- C. Activate the change documents for the equipment reference category.
- D. Activate the change documents for the equipment category.
Answer: B,D
NEW QUESTION # 50
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question
- A. Estimated annual performance
- B. Start counter reading
- C. Scheduling period
- D. Counter overflow reading
Answer: A,B
NEW QUESTION # 51
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.
- A. Dispatch maintenance order operations
- B. Schedule and dispatch maintenance operations by shifts.
- C. Monitor maintenance order operations due in the next 4 weeks
- D. Print job papers from a maintenance order.
Answer: A,C
NEW QUESTION # 52
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?
- A. Initial/subsequent buffer
- B. Scheduling type
- C. Package offset
- D. Call horizon
Answer: A
NEW QUESTION # 53
Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question
- A. Link PM task list with assigned inspection point type to a maintenance item.
- B. Generate Inspection Lols within the checklists view.
- C. Record the usage decision for an Inspection Lot
- D. Generate Inspection Lots assigned to maintenance order headers.
Answer: C,D
NEW QUESTION # 54
Which steps are available for the maintenance technician when using the Report Malfunction bile? Note: There are 3 correct answers to this question.
- A. Input estimated costs for repair malfunction
- B. Display the current location of the technical object
- C. Select and print the maintenance order shop papers
- D. Add a URL to provide further information
- E. View details of the technical object by navigating to the Asset Viewer
Answer: B,D,E
NEW QUESTION # 55
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question
- A. The order moves to the Preparation phase once it is approved and released
- B. The configuration of the order type decides whether you use Resource Scheduling or not.
- C. Maintenance Planning Buckets give you a list of non-approved notifications
- D. If you use the Resource Scheduling apps, you always dispatch orders and operations.
Answer: A,D
NEW QUESTION # 56
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question
- A. It limits the types of characters in the edit mask to Alpha and Numeric.
- B. It restricts the number of hierarchical levels to no more than 6
- C. It sets the hierarchy levels of the functional location structure.
- D. It defines the allowed characters for a functional location
Answer: A,C
NEW QUESTION # 57
You require stock material to carry out maintenance tasks. What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?
- A. A goods issue can be entered for planned and unplanned material
- B. For stock material you always need a reservation
- C. The pick list for materials can be printed before order release.
- D. Material can be assigned at the order header level.
Answer: A,B
NEW QUESTION # 58
What do you have to consider when planning maintenance work that is to be carried out by an external company?
- A. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
- B. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
- C. In the control key assigned to the order operation, the "Service" indicator must always be activated.
- D. For the maintenance order type, you have to assign the Enhanced Procurement Mode.
Answer: C
NEW QUESTION # 59
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A. Actual finish date of the maintenance order
- B. The date of the final confirmation
- C. Planned date of the next call, independent of maintenance order dates
- D. Technical completion date of the maintenance order
Answer: D
NEW QUESTION # 60
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan? Note: There are 2 correct answers to this question
- A. Set the call horizon to 90 days.
- B. Set the offset to 3 months
- C. Set the call horizon to 25%.
- D. Set the call horizon to 75%
Answer: B,C
NEW QUESTION # 61
Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question
- A. A collection of tools that are not included with core SAP S/4HANA
- B. SAP Business Objects as a part of SAP Business Warehouse (BW)
- C. Preconfigured Core Data Service (CDS) containing SQL views
- D. SAP Business Objects Business Intelligence for Visualization
Answer: B,C
NEW QUESTION # 62
How can you assign a material BOM to a piece of equipment?
- A. Via creation of an equipment BOM
- B. Via field model number in the equipment master
- C. Via field construction type
- D. Via material BOM header in the serialization data
Answer: C
NEW QUESTION # 63
What is the goal of embedded analytics in SAP S/4HANA?
- A. To integrate BW Info Cubes
- B. To integrate BW Data Store Objects
- C. To allow both tactical and strategic analyses within the S/4HANA core
- D. To combine transactional and analytical processing
Answer: D
NEW QUESTION # 64
The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?
- A. A purchase requisition will ALWAYS be created as soon as the order is saved.
- B. A purchase order is created automatically as soon as the order is saved.
- C. A goods receipt can be posted after the maintenance order is technically completed.
- D. A purchase requisition can be created automatically as soon as the order is saved.
- E. The maintenance order can be set to TECO before the invoice is created
Answer: A,D,E
NEW QUESTION # 65
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?
- A. Open purchase requisitions are recompiled
- B. Open purchase orders are recompiled.
- C. Referenced notifications are put in Process again.
- D. Open reservations are recompiled.
Answer: A,D
NEW QUESTION # 66
......
Free Sales Ending Soon - 100% Valid C-P2W43-2023 Exam: https://examtorrent.braindumpsit.com/C-P2W43-2023-latest-dumps.html